Thanks for watching – This one failed to post on Wed. so here it is.
While waiting for weather, paperwork and supplies to lineup, we are working on the massive amount of prep work required to get this house ready to paint. Everything from small pin holes to large pieces of sheetrock being added to holes. This kind of work is not fun in any fashion but getting it done is vital to the final product looking as good as possible.


PROMISED LINKS:
–Dillys Amazon Store – http://deals.dillysadv.com/
–Oscillating Multi-Tool Kit – http://amzn.to/2j9oieb
–Ultimate Nitrile Grip Work Gloves – http://amzn.to/2zmYTob


Support our work at ►https://www.patreon.com/Dillysadv OR http://dillysadv.com/dillys-deals/

FOLLOW ME ON FACEBOOK► http://www.facebook.com/DILLYSADV

OTHER CHANNELS
DILLYSADV► https://www.youtube.com/c/DillysADV
DILLYS ARCHIVE► https://goo.gl/UiofVp

FILE # 4314″

2 thoughts on “PREP IS PRIORITY

Leave a Reply

Back To Top